Search scope:
排序: Display mode:
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Engineering 2024, Volume 32, Issue 1, Pages 100-106 doi: 10.1016/j.eng.2023.09.020
Keywords: Rock-filled concrete dam Pouring compactness Effect of large rocks Intelligent quality control Unmanned
Dam Concrete Placement by Towerbelt
Peng Gang
Strategic Study of CAE 2004, Volume 6, Issue 9, Pages 77-80
Keywords: TGP towerbelfs pouring concrete
Concrete construction technology on tower beam of Three Gorges Project ship lift
Yu Ying
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 27-32
Keywords: ship lift beam concrete construction joints pouring stratification Three Gorges Project
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 22-26
The construction time limits for the tower column concrete of Three Gorges Project ship lift is pressed for time and require high accuracy. In order to ensure the construction progress and quality, the hydraulic self-climbing formwork is used. This paper focuses on the construction technology of hydraulic self-climbing formwork, improvement measures of self-climbing formwork as well as structural measures made in the plate girders and corbels department of tower to meet the rising-up of self-climbing formwork on Three Gorges Project ship lift tower column concrete. It has been found that application and improvement of the hydraulic self-climbing formwork construction technology meet the design requirements of the tower column cylinder concrete of the Three Gorges ship lift, effectively improve the construction efficiency, save cost, ensure the engineering quality and improve the safety of the construction,can provide reference for other hydropower project construction.
Keywords: tower concrete hydraulic self-climbing formwork concrete pouring Three Gorges Project ship lift
Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project
Huang Jiaquan,Ma Shaofu,Yu Yongjun
Strategic Study of CAE 2013, Volume 15, Issue 9, Pages 59-63
Keywords: construction equipment equipment layout concrete pouring boat cab Three Gorges Project ship lift
Huang Yaoying,Ding Yuemei,Lv Xiaoman and Xu Bailin
Strategic Study of CAE 2014, Volume 16, Issue 3, Pages 59-63
Keywords: sluice pier superficial heat preservation water cooling pouring temperature intelligent optimization
Concrete-Filled Steel Tube Arch Bridges in China Review
Jielian Zheng, Jianjun Wang
Engineering 2018, Volume 4, Issue 1, Pages 143-155 doi: 10.1016/j.eng.2017.12.003
Keywords: Steel-reinforced concrete arch bridge Cable-stayed fastening-hanging cantilever assembly Vacuum-assisted pouring
Title Author Date Type Operation
A Brief Review of Rock-Filled Concrete Dams and Prospects for Next-Generation Concrete Dam Construction Technology
Feng Jin, Duruo Huang, Michel Lino, Hu Zhou
Journal Article
Concrete construction technology on tower beam of Three Gorges Project ship lift
Yu Ying
Journal Article
Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork
Dai Zhiqing
Journal Article
Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project
Huang Jiaquan,Ma Shaofu,Yu Yongjun
Journal Article
Intelligent optimization of temperature control and crack prevention measures for sluice pier concrete structure
Huang Yaoying,Ding Yuemei,Lv Xiaoman and Xu Bailin
Journal Article